Working drawings spread on a studio table, with a massing model and a laptop

All services

Project management

How it works

How project management starts

Management plugs in after design or alongside supervision on active sites.

  1. 01

    Tell us about your project

    Share contractor quotes, programme and your reporting expectations (weekly email, WhatsApp, etc.).

  2. 02

    We scope and quote

    The bureau defines management hours, milestones and fee separate from pure supervision if both are needed.

  3. 03

    Agreement and kick-off

    After agreement, the manager joins site meetings and tracks cost and schedule against the BOQ.

Delivery managed from the same office

Planning, coordination, budgeting and site reporting when you want the bureau to steer the build not only supply drawings.

  • Jean-Claude
  • Aline
  • Eric
  • Claudine
Architectural floor plan from the bureau drawing set
Sample sheet · Plan store

Project management is keeping the drawing, the money and the time on one job. The four pieces are planning, coordination, budgeting and site monitoring. Without them, the architect's set, the engineer's calculations and the permit each move on their own, and the site follows whichever paper arrived last.

Planning is the order of the tasks. Coordination is one current set of drawings, so the wall, the beam and the pipe are not drawn in the same place. Budgeting is a list of the work and its cost, before a builder's price is accepted. Monitoring is a visit and a record at the stages that cannot be seen later. The aim is a building that matches the permitted drawings, in the time and for the cost that were written down.

What this includes

  • An order of tasks, with dates
  • One current set of drawings
  • A cost written down before the builder's price
  • Visits at the stages that get covered
  • A record the owner can read

Planning, coordination, budgeting and monitoring are the four parts named for this service. The cost list is the bill of quantities the permit file also asks for.

Talk about this

How we work

From the first idea to a build-ready project

Every successful building starts with a clear brief, an understood site and coordinated technical work. These six stages follow professional practice from RIBA-style briefing through handover and the Rwanda Building Code in language you can scan on one page.

  1. 01

    Project brief & site assessment

    Your requirements, the land and the rules agreed before design starts.

    Objective

    Understand what the building must do, what the site allows and what investigations are needed before anyone commits to a layout.

    What our team does

    Architects and project managers hold structured consultations: room counts, circulation, budget range, timeline and quality level. We document priorities and non‑negotiables so the design serves daily life, not only appearance.

    Expertise applied

    Architectural programming, preliminary zoning review and coordination with licensed surveyors and geotechnical engineers when a topographical map or soil report is required for your UPI.

    Site and technical review

    On site we assess topography, access, orientation, drainage, neighbouring buildings and utility connections. We do not replace formal survey or soil testing we coordinate those reports when you have them and tell you when they are missing for permit or structure.

    What you receive at this stage

    • Written project brief and agreed scope
    • Site assessment notes and feasibility flags
    • List of surveys or reports still required
    • Initial programme and fee basis for design

    How this reduces risk and cost

    You avoid paying for a layout that cannot be permitted or built on your plot. Risks surface early, when changes are cheap.

    Survey pegs and levels on a residential plot

    Survey pegs and levels on a residential plot

    Professionals on this stage

    • Arch. Jean-Claude Habimana

      Founder & principal architect

    • Claudine Mukamana

      Project manager

    • Arch. Aline Uwase

      Lead architect

    At a glance

    • Room list, budget band and timeline captured in writing
    • Setbacks, height and coverage checked for your district
    • Topo and soil reports flagged if still missing
  2. 02

    Architectural concept & design development

    From requirements to a layout you can walk through before full engineering sheets.

    Objective

    Turn the brief and site facts into a coherent architectural proposal: massing, plans, sections and character that fit the land and your programme.

    What our team does

    We explore orientation, massing and room relationships hand sketches and study models first, then CAD. Options are compared for light, ventilation, privacy and buildability on sloping or tight plots.

    Expertise applied

    Registered architects lead spatial planning, circulation and elevations. Structural and services engineers review the concept for column zones, service routes and roof spans before you approve the direction.

    Presentation and approval

    You receive plans, sections and elevations at a scale you can understand, plus 3D views when agreed in scope. Feedback is recorded; only then do we move to dimensioned working documentation.

    What you receive at this stage

    • Approved concept layout and massing
    • Preliminary plans, sections and elevations
    • Recorded design decisions and revisions

    How this reduces risk and cost

    You see and adjust the house while changes are still inexpensive not after walls are built.

    Hand-drawn concept plan and section on the studio table

    Hand-drawn concept plan and section on the studio table

    Professionals on this stage

    • Arch. Jean-Claude Habimana

      Founder & principal architect

    • Arch. Aline Uwase

      Lead architect

    • Eng. Eric Mugisha

      Structural engineer

    At a glance

    • Massing tested for sun, wind and privacy on your plot
    • Structure and services zones agreed before CAD detail
    • Your sign-off recorded before working drawings start
  3. 03

    Engineering design & technical documentation

    Coordinated architectural, structural and services drawings contractors can price and build from.

    Objective

    Convert the approved design into dimensioned, code-aware documentation not decorative CAD, but instructions that reduce guesswork on site.

    Architectural documentation

    Dimensioned floor plans, sections, elevations, details, door and window schedules, finishes and site works drawn for the builder and aligned with Rwanda Building Code expectations and district submission formats.

    Structural engineering

    In-house structural engineers size foundations, columns, beams and slabs from your geotechnical data and imposed loads Eurocode-based calculations, reinforcement schedules and details. Foundation type follows your soil report, not another project's habit.

    Building services & coordination

    Electrical, plumbing, drainage and ventilation layouts are routed with structure and architecture so pipe openings, slab penetrations and ceiling zones are resolved before construction. Revisions are tracked across disciplines on bureau-produced sets.

    Quantities and specifications

    Where included, bills of quantities and material specifications help you compare contractor quotes on the same scope the same basis the studio uses on store plans.

    What you receive at this stage

    • Coordinated architectural and structural drawing set (PDF + CAD as agreed)
    • Electrical and plumbing/drainage layouts for typical residential scope
    • Structural calculations and reinforcement schedules
    • Bill of quantities when in scope

    How this reduces risk and cost

    Contractors price the same complete instruction set fewer site surprises, fewer costly variations, clearer accountability between design and build.

    Dimensioned architectural floor plan on screen

    Dimensioned architectural floor plan on screen

    Professionals on this stage

    • Arch. Jean-Claude Habimana

      Founder & principal architect

    • Arch. Aline Uwase

      Lead architect

    • Eng. Eric Mugisha

      Structural engineer

    • QS Diane Ingabire

      Quantity surveyor & cost planning

    At a glance

    • Architectural, structural and MEP sheets issued as one coordinated set
    • Foundation design tied to your geotechnical report
    • BOQ and specs when included in your appointment
  4. 04

    Regulatory approvals & permitting

    Permit-ready files and follow-up without promising authority timelines.

    Objective

    Align the technical design with land-use, building and safety rules, then prepare and support the application through BPMIS in Kigali and district channels.

    What our team does

    We check setbacks, height, coverage and accessibility against applicable rules, assemble architectural and structural sheets, land documents, forms and supporting layouts (drainage, fire, MEP as required for your building class).

    Expertise applied

    Architects and engineers who produced the set answer authority queries and revise drawings when comments are technical. Permit success depends on complete land papers and the district schedule we track status and respond; we do not control issuance dates.

    What you receive at this stage

    • Permit submission drawing package
    • Completed forms and document checklist
    • Query responses and revision records

    How this reduces risk and cost

    You spend less time in queues and resubmissions because the file matches what authorities expect for your UPI and building type.

    Structural and permit drawing sheet with details

    Structural and permit drawing sheet with details

    Professionals on this stage

    • Patrick Niyonzima

      Permits & compliance

    • Arch. Jean-Claude Habimana

      Founder & principal architect

    • Eng. Eric Mugisha

      Structural engineer

    At a glance

    • Land title, UPI and forms checked before submission
    • BPMIS and district queries answered by the authors of the drawings
    • Approval timing depends on the authority we track, we do not guarantee dates
  5. 05

    Construction supervision & technical support

    Agreed inspections and reporting distinct from full-time site management.

    Objective

    Give the builder clear technical answers and the owner visibility when work is on site especially for clients abroad.

    What our team does

    At milestones such as setting-out, foundations, frame, roof and services, engineers and architects visit when supervision or inspection is in your licence or contract. We record what was built versus the issued drawings and flag discrepancies.

    Expertise applied

    Structural review before concrete pours, clarification sketches for the contractor, and photo reports on an agreed rhythm. This is not continuous resident supervision unless you contract project management separately.

    What you receive at this stage

    • Inspection visit reports with photographs
    • Technical clarifications and minor drawing revisions
    • Progress summaries for remote clients

    How this reduces risk and cost

    Design intent reaches the site and you know early if the builder deviates, before concrete hides the mistake.

    Concrete frame inspected during construction

    Concrete frame inspected during construction

    Professionals on this stage

    • Eng. Eric Mugisha

      Structural engineer

    • Claudine Mukamana

      Project manager

    • Arch. Jean-Claude Habimana

      Founder & principal architect

    At a glance

    • Milestone visits not full-time resident supervision unless contracted
    • Photo reports for owners building from abroad
    • Clarifications and minor revisions logged against the issued set
  6. 06

    Project completion & handover

    Close-out inspections, as-built information and maintenance records when in scope.

    Objective

    Document what was built and give you the information to operate, maintain and later extend the property.

    What our team does

    Where contracted, we walk the completed work against the permit set, list outstanding items, and update drawings to reflect approved changes made during construction.

    Expertise applied

    Architects and engineers prepare as-built sheets and a practical maintenance file equipment notes, warranty reminders and key supplier contacts when we supervised or managed the job.

    What you receive at this stage

    • Completion inspection and snagging list
    • As-built drawings when included
    • Maintenance and operation file

    How this reduces risk and cost

    You receive more than keys a record for the next renovation, insurer or buyer, and fewer mysteries behind the walls.

    Completed house on handover day

    Completed house on handover day

    Professionals on this stage

    • Claudine Mukamana

      Project manager

    • Arch. Jean-Claude Habimana

      Founder & principal architect

    • Patrick Niyonzima

      Permits & compliance

    At a glance

    • Snagging list and completion walk-through when in scope
    • As-built sheets reflect approved site changes only
    • Maintenance file for equipment and finishes you received

FAQ for your project

  • Is management separate from supervision?

    Supervision focuses on quality and compliance on site. Management adds scheduling, contractor coordination and budget control across the whole build.

  • When does management start?

    Usually after working drawings and permit are in place and a contractor is chosen; earlier involvement is possible on large commissions.

  • Do you hire contractors for me?

    The bureau coordinates and monitors contractors you select; procurement support can be scoped in the project agreement.

Plan added to cart successfully.